Standard Penetration Testing (SPT), coring, and test pits to recover samples and record sub-surface profiles for foundation and structural design.

What the work involves

Boreholes advanced with Standard Penetration Testing to ASTM D1586, where a split-spoon sampler is driven by a 63.5 kg hammer falling 760 mm and the blows per 150 mm increment are logged as the N-value. Coring recovers continuous samples through rock or stiff strata; test pits expose shallow profiles directly. The output is a logged soil profile, the groundwater level, and samples recovered for laboratory testing.

The problem it solves

Designing a foundation without knowing what the soil below it can actually carry.

Where it applies

Residential and institutional buildings, roads, and government infrastructure.

FAQ

Soil Investigation & Sub-Surface Exploration FAQs

Answers to common questions about soil investigation & sub-surface exploration in the Philippines.

  • The soil carries the building, not the other way round. A soil investigation establishes bearing capacity, groundwater level, and the depth and strength of each layer below the site, so the foundation can be designed for the ground that is actually there. Skipping it means designing on assumption — which shows up later as differential settlement, cracked slabs, or a foundation that has to be redesigned mid-project at far greater cost.
  • SPT is the most common in-situ test in soil investigation, carried out to ASTM D1586. A split-spoon sampler is driven into the bottom of a borehole by a 63.5 kg hammer falling 760 mm. The number of blows needed to drive each 150 mm increment is recorded, and the blows for the second and third increments give the N-value. That N-value correlates with the soil's density and strength, and it also recovers a disturbed sample for laboratory classification.
  • It depends on the footprint, the structure type, the loads, and how variable the ground turns out to be — a small residential lot on uniform ground needs far less than a mid-rise on reclaimed or mixed fill. The number and depth are agreed after a site assessment rather than fixed in advance, because the point of the investigation is to cover the ground the structure will actually sit on. Describe your site and structure and we will advise on a scope.
  • Sub-surface exploration, soil sampling, in-situ testing, laboratory analysis, and geotechnical reports to support structural and foundation design.
  • It varies with the number and depth of boreholes, site access, ground conditions, and the laboratory programme the samples require — a compact residential investigation is a very different job from a multi-borehole investigation for infrastructure. Programme is agreed with the scope rather than quoted generically. Send us the site details and intended structure and we will give you a realistic timeline.