Garbia Group services

Site Assessment

Desk study and site reconnaissance that establish ground conditions, access, and the scope of investigation a project needs before drilling begins.

What the work involves

A desk review of available geological and project information, followed by a walkover of the site. This establishes access for rigs, proximity of existing structures and services, surface conditions and any signs of past fill or instability — and from that, how many boreholes or test pits the investigation needs and how deep they should go.

The problem it solves

Committing to a drilling programme before anyone has looked at the ground, access, or nearby structures.

Where it applies

All project types, before an investigation scope is agreed.

FAQ

Site Assessment FAQs

Answers to common questions about site assessment in the Philippines.

  • It depends on the footprint, the structure type, the loads, and how variable the ground turns out to be — a small residential lot on uniform ground needs far less than a mid-rise on reclaimed or mixed fill. The number and depth are agreed after a site assessment rather than fixed in advance, because the point of the investigation is to cover the ground the structure will actually sit on. Describe your site and structure and we will advise on a scope.
  • Sub-surface exploration, soil sampling, in-situ testing, laboratory analysis, and geotechnical reports to support structural and foundation design.
  • It varies with the number and depth of boreholes, site access, ground conditions, and the laboratory programme the samples require — a compact residential investigation is a very different job from a multi-borehole investigation for infrastructure. Programme is agreed with the scope rather than quoted generically. Send us the site details and intended structure and we will give you a realistic timeline.